VA Hospital—Nuclear Imaging Room

Category
case studies, Railset
Tags
cladding hardware, interior remodel, railset webbing
About This Project

Issue: The nuclear imaging rooms are built with a lead-lining that extend 7 feet up the wall. Using a typical z-clip installation was not an option for installing the specified wall cladding.

Solution: Railset frames was anchored to the floor, then attached back to the wall above the 7-foot mark. Spaced 5” away from the existing wall, the Railset frame created a cavity for the back-lighted graphic and transformer.